Work orders and bills of materials: BOMs, routings, stock and cost
Version 1.0 — Last updated:
A bill of materials (BOM) says which materials, in what quantity, go into one unit of a product. A routing says which operations run on which machine and for how long. A work order releases both for a given quantity and date. When production is reported, materials leave stock, the finished item enters stock, and actual cost is compared with the BOM and routing standard.
Production data in an ERP rests on three records: the bill of materials, the routing and the work order. The BOM says what is made, the routing how it is made, and the work order how many and when. This guide from Turkey-based Gramoni explains how the three connect to each other, to stock and to cost, and lists the data mistakes manufacturers make most. It is vendor-neutral, and it points out where Turkish accounting rules apply, for international companies running a plant in Turkey.
The three core records
| Record | Question it answers | Data it holds | What it drives |
|---|---|---|---|
| Bill of materials (BOM) | What goes into one unit? | Materials and sub-assemblies, quantity, unit of measure, scrap rate, version | Material requirements, consumption, material cost |
| Routing | Which steps make it? | Operation sequence, machine or work centre, set-up and run time | Capacity, labour and machine cost |
| Work order | What, how many, by when? | Item, quantity, due date, BOM and routing version | Release to the shop floor, production results, stock movements |
The BOM: what goes in, and how much
A BOM lists the materials and sub-assemblies, and their quantities, needed for one unit of the finished item.
- A single-level BOM shows only direct components. A multi-level BOM includes the BOMs of its sub-assemblies; three or four levels are normal for an assembled product.
- Quantity and unit of measure must agree. If a material is bought by the kilogram and consumed by the metre, the conversion belongs on the product card.
- The scrap rate captures expected loss: offcuts, first shots, set-up pieces. Leave it out and both requirements and cost come out systematically low.
- The version says from when the BOM is valid. A design change opens a new version; existing work orders finish on the old one.
The engineering BOM and the manufacturing BOM are often different. Engineering groups parts by function; manufacturing structures them by production sequence, stocked sub-assemblies and bought-in parts. Decide early which one is the ERP record.
The routing: how it is made
A routing defines the operations the item passes through, in order. For each operation, record:
- The machine or work centre, and any alternative.
- Set-up time: mounting tools or moulds, adjustment, first-piece approval. It is spent once per batch, whatever the batch size.
- Run time: time per unit or per batch.
- The number of operators, or the skill required.
- Materials consumed at that operation, if the BOM links them to it.
Set-up time is the line most often missing. In small batches it is a large share of unit cost; without it, small orders look cheaper than they are.
The work order: releasing the plan
A work order is an instruction to produce a given quantity of an item by a given date. When it is released, it takes the BOM and routing versions valid that day.
- Release: material requirements come from the BOM, operations and times from the routing.
- Material check: stock is checked; shortages become purchase requests or lower-level work orders.
- Dispatch: the work order and its operations are sent to the shop floor, to the right machine.
- Production reporting: good and scrap quantities, operation start and finish times and operator details are reported back.
- Close: once the full quantity is produced, or the remainder is cancelled, the order is closed and costing is completed.
How work orders move stock
A work order moves stock in two directions. Materials and sub-assemblies are consumed; the finished item or higher-level sub-assembly is received into stock. Both are derived from the production report: consumption is the BOM quantity times the quantity produced, with actual scrap recorded on top.
So stock accuracy depends directly on BOM accuracy. A material missing from the BOM is never consumed in the system; an inflated quantity drains stock faster than reality. Both show up as count differences.
Stock record errors are more common than people assume. In DeHoratius and Raman's study of nearly 370,000 inventory records across 37 stores of one retailer, 65% were inaccurate (Management Science, 2008). The study is from retail, but the lesson carries over: a stock record does not track physical stock on its own; it is only as good as the process that writes it.
How work orders drive cost
Under TMS 2 Inventories, the Turkish accounting standard aligned with IFRS and published by KGK, the cost of a manufactured item is its costs of purchase plus its costs of conversion. Conversion costs include costs directly related to production, such as direct labour, and a systematic allocation of fixed and variable production overheads (TMS 2, paragraphs 10–12).
In the ERP, each of these comes from one of the three records:
- Material cost comes from BOM quantity and scrap times material price.
- Labour and machine cost comes from routing set-up and run times times hourly rates.
- Production overhead is usually allocated per machine hour or labour hour. Under TMS 2, fixed overhead is allocated on the basis of normal capacity, and the amount per unit is not increased because of low production or idle plant (paragraph 13).
Under the standard cost method, normal levels of materials, labour, efficiency and capacity utilisation are used, and standards are reviewed regularly and revised where needed (TMS 2, paragraph 21). Abnormal amounts of wasted materials, labour and other production costs are not part of inventory cost; they are expensed in the period (paragraph 16).
When a work order closes, actual cost is compared with standard. The variance comes from three places: material quantity, time and price. Reading it line by line shows which is a data error and which is a real production problem.
Common data mistakes
- No scrap rate. Requirements come out low, shortages are topped up by hand on every order, and cost looks lower than it is.
- Unit-of-measure mix-ups. No conversion between kilograms, metres and pieces, so consumption is posted in the wrong unit.
- No set-up time. Small batches look cheap; the capacity plan shows idle time that does not exist.
- Copied times. Routing times were copied from a similar item and never checked against real measurements.
- Unversioned changes. BOMs were edited in place; open work orders and past cost comparisons lose their meaning.
- Dead cards. Obsolete material and product cards were never deactivated, and the wrong card ends up on a new BOM.
- Hand-corrected consumption. Real consumption on the floor is never fed back to the BOM, so the same count differences are closed by hand every month.
- Late reporting. Production is reported in bulk days later, and stock and cost are wrong until then.
Checklist
- Every item has one valid BOM version and one valid routing version.
- Scrap rates are defined on the BOM or the operation.
- Unit-of-measure conversions are defined on the product cards.
- Every operation has a machine, a set-up time and a run time.
- BOM and routing changes are made through versions.
- Production is reported when the operation finishes, the same day.
- Standard-to-actual variances on closed work orders are reviewed regularly.
- Count differences are fed back into BOMs and routings.
ERP use in European manufacturing
According to Eurostat, 46.45% of EU enterprises used ERP software in 2025. In manufacturing the share was higher, at 57.62%. Keeping BOM, routing and work-order data in one system is a more common need for manufacturers than for other sectors.
Where the ERP ends and the shop floor begins
The international ISA-95 standard (IEC 62264) places business management at level 4 and manufacturing execution systems (MES) at level 3, and deals mainly with the interface between the two. BOMs, routings and work orders are set up at level 4, in the ERP. Running and reporting the operation on the floor is level 3 work. The weaker the link between them, the later and more manual production reporting becomes.
What Gramoni does here
Gramoni is a Workcube partner; Workcube is a Turkish ERP platform. Three of Gramoni's add-ons for manufacturers on Workcube work with the data described in this guide:
- WorkPlanner for Workcube opens Workcube's BOMs, routings, machines and working calendars to Novalab's scheduling engine. A pre-check lists missing data and the screen where it can be fixed, so gaps show up before the plan runs.
- MES for Workcube sends work orders and operations to the floor from one screen. From start/finish reports it creates the production result and operator time, and posts production output and consumption vouchers automatically. Today it works with trex Dijital's shop-floor MES.
- WAMS Quotation & Cost Management (WAMS stands for Workcube Advanced Manufacturing System) turns an accepted make-to-order quote into a Workcube product card and multi-level BOM in one step. How that quote is costed is covered in the guide to quote costing in manufacturing.
What each add-on does and does not do is set out on the manufacturing solutions for Workcube page. If you are still choosing an ERP, start with the ERP selection guide.
Frequently asked questions
Is a BOM the same as a recipe or formula?
In practice, yes. Both list the materials and sub-assemblies needed for one unit of output. Process industries such as chemicals and food tend to say recipe or formula; discrete manufacturers say bill of materials. In Turkish ERP screens you will usually see "ürün ağacı" or "reçete".
Can we run work orders without routings?
You can, because material requirements come from the BOM alone. Without a routing, though, nobody knows which operation runs on which machine and for how long. You cannot plan capacity, and labour and machine time cannot be costed realistically.
Should scrap go on the BOM or on the work order?
Expected, normal scrap belongs on the BOM or the operation as a rate, so requirements and cost are right from the start. Actual scrap is reported on the work order. Under TMS 2, the Turkish inventory standard, abnormal waste is not part of inventory cost; it is expensed in the period.
What happens to open work orders when a BOM changes?
In a well-run setup, each work order keeps the BOM and routing version it was released with. You decide separately from which date or which order the change applies. Without versioning, open orders can change silently.
Why does actual cost differ from standard cost?
The usual causes are material consumed above or differently from the BOM, operations taking longer than the routing says, set-up time missing from the routing, and outdated prices. Reading the variance line by line shows which is a data error and which is a real production problem.
How many European manufacturers use ERP?
According to Eurostat, 46.45% of EU enterprises used ERP software in 2025; in manufacturing the share was 57.62%.
Sources
- KGK — TMS 2 Inventories (Turkish Accounting Standard) — Public Oversight, Accounting and Auditing Standards Authority (KGK)
- ISA-95 Series of Standards: Enterprise-Control System Integration — International Society of Automation
- DeHoratius & Raman — Inventory Record Inaccuracy: An Empirical Analysis (Management Science, 2008) — Management Science / RePEc
- Eurostat — E-business integration (2025 data) — Eurostat